Centrinis Klaipėdos terminalas

News

 

On 22nd of August 2018, Cruise ship MSC Orchestra (293 m. long ) was visiting our terminal.

 

On 9th of June 2018, we accepted first call of a new ferry connection from Klaipėda (LT) to Trelleborg (SE).

On 7th of April 2018, terminal has started to operate the new railway capacity two additional roads: No. 11, No. 12, equipped with the 70 t. stationary ramp for heavy equipment loading on to the platforms. The project was launched by Central Klaipeda Terminal UAB and  Klaipėda Sea Port Authority.

. February 2018, we raise the three colour flag together with whole Klaipėda port.

 

 

 

© 2014 Visos teisės saugomos. Svetainės dizainas ir programavimas Amburia branding